7/6/2010
-Lecturer from UNITEN, Dr Abdullahi visited us for our Industrial Training evaluation-we talked about what we have done for the past 2 months.
-Worked on the 2nd floor structural key plan of a 3 storey housing project in Rawang.
8/6/2010
-Drew the roof structural key plan of a 3 storey housing project.
9/6/2010
-Continued with the beam sizing for the 2nd floor and roof. Did a bit of calculation to determine the thickness of the slab.
10/6/2010
-Prepared a report for Haizal on sewerage design for housing development in Bandar Kinrara, Puchong (Phase MV1 & MV2). This report is to get approval from IWK for a few manholes and sewer pipes at this development.
11/6/2010
-Followed Haizal to the site, Balai Seni Lukis Negara. Construction of a 7 storey administration building has been going on for about 1 year. Mr Ng Keng Wai, the assistant residential engineer took us around the building and explained about the construction.