31/5/2010
-Site visit to Emerald West, Rawang
1/6/2010
-Checked the beams for Law Lok Hong, Phase 3F project.
2/6/2010
-Attended a short lecture by Ir. Lim on the drainage system in Malaysia.He spoke about the drainage system before and after the implementation of MASMA.
-Learnt up a little bit on the designing of staircases.
3/6/2010
-Followed Ir. Low Chen Seng to the site of construction of a 2 storey bungalow in Taman Melawati, Ulu Kelang.
-went to another site in Telok Panglima Garang, Kuala Langat where they were building a factory, Chemi Con.
-Went to two authority departments for some submission work, Jabatan Saliran Air and Majlis Daerah Kuala Langat.
Sunday, July 4, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment