3/5/2010 - 4/5/2010
-Cross sections for a retention pond.
- I did 7 cross sections and scale used was 1 : 1000 for both horizontal and vertical.
-Determined the amount to be cut and filled based on the proposed ground level.
5/5/2010
-Continued with cross sections for retention pond. Calculated volume to be cut and filled.
-Marked points of 30m interval on the apron, where level readings are taken every fortnight and found certain points have settlement up to 4mm.
6/5/2010 - 7/5/2010
-Computed table for cumulative population equivalent built-up for Bandar Sri Damansara.
-There were revised layout plan for are A05 & A06, A13 also. From this, I found out that the current sewage treatment plants NO 3 is insufficient, so a few STP's has to be proposed.